ROADS & PERMANENT BRIDGE SLOPE STABILITY DESIGN

Job ID: 31601539

Budget: $750 – $1,500 USD

1.
Geotechnical Slope Stability Report for the cut slope of Road P1 must include detailed design and concise conclusion & recommendatios to submit to client as per all mentioned in general requirements.

2. Geotechnical Slope Stability Report for the cut slope of Road P5 must include detailed design and concise conclusion & recommendatios to submit to client as per all mentioned in general requirements.

3. Geotechnical Slope Stability Report for the Excavation work stability (Left Bank) at the Permanent Bridge must include detailed design and conciseconclusion & recommendatios to submit to client as per all mentioned in general requirements.