SB-9 Lot Split Plan

Job ID: 40407746

Budget: ₹12,500 – ₹37,500 INR

I have received a formal letter from the city outlining corrections needed on my current site plan. In addition to addressing those comments, I also need a compliant SB-9 package that cleanly subdivides the existing parcel into two lots.

Here’s what I expect from your work:

• Update the existing CAD/PDF site plan so every item flagged by the city is resolved—setbacks, easements, annotations, or any other red-lined detail.
• Prepare a clear, to-scale SB-9 subdivision exhibit that shows the new lot lines, net and gross areas, and all required notes per state guidelines.
• Coordinate any related adjustments—utility stubs, drive access, or revised frontage calculations—so the split will pass both planning and public works review.
• Deliver the revised plan set in PDF and an editable CAD file, ready for direct resubmittal.

If you have recent experience getting SB-9 lot splits approved in California and can turn red-lines around quickly, I’d love to work with you.