WA Licensed Civil Engineer Needed
Budget: $50 – $0 USD
I have a fully surveyed 2-acre residential parcel in Maple Valley, WA with short-plat drawings already approved and the full site-development set now back from the City with review comments. The City’s response is clear: before they will issue the permit they want stamped stormwater management calculations and a licensed Washington civil engineer’s formal review of my plans.
Scope of work
• Produce stormwater management calculations—runoff volume and infiltration rate are the two metrics the City singled out.
• Review the entire site-development drawing package, focusing on drainage systems, erosion control, site grading, and the way impervious-surface runoff is handled.
• Provide any minor drawing mark-ups necessary to bring the set into compliance.
• Prepare and apply your professional engineer’s stamp along with a brief letter or form required by the City confirming that the submittal meets Washington standards and Maple Valley code.
Important context
– Professional topographical and site survey is complete.
– I’m a GC and mechanical engineer with four decades of field experience, so coordination will be straightforward.
– All native files (AutoCAD Civil 3D, PDFs) are ready for immediate hand-off, and I can supply the City’s redlined comment sheet on request.
Deliverables for acceptance
1. Signed and stamped stormwater calculation report (PDF and native format).
2. Marked-up plan set or revised sheets reflecting any required tweaks.
3. Engineer’s certification letter suitable for direct upload to the City’s permit portal.
The files are ready today; my goal is to resubmit within the coming week. Let me know your availability, WA PE license number, and any questions you may have so we can move forward promptly.
Scope of work
• Produce stormwater management calculations—runoff volume and infiltration rate are the two metrics the City singled out.
• Review the entire site-development drawing package, focusing on drainage systems, erosion control, site grading, and the way impervious-surface runoff is handled.
• Provide any minor drawing mark-ups necessary to bring the set into compliance.
• Prepare and apply your professional engineer’s stamp along with a brief letter or form required by the City confirming that the submittal meets Washington standards and Maple Valley code.
Important context
– Professional topographical and site survey is complete.
– I’m a GC and mechanical engineer with four decades of field experience, so coordination will be straightforward.
– All native files (AutoCAD Civil 3D, PDFs) are ready for immediate hand-off, and I can supply the City’s redlined comment sheet on request.
Deliverables for acceptance
1. Signed and stamped stormwater calculation report (PDF and native format).
2. Marked-up plan set or revised sheets reflecting any required tweaks.
3. Engineer’s certification letter suitable for direct upload to the City’s permit portal.
The files are ready today; my goal is to resubmit within the coming week. Let me know your availability, WA PE license number, and any questions you may have so we can move forward promptly.