Full Drainage Layout for a glamping site UK ONLY
Budget: £1,500 – £3,000 GBP
A full drainage layout will be required for the site to show separate systems for the foul
drainage and surface water. Building Control will require invert levels to show there is
adequate fall, and details of any soakaways, treatment plant, or pumping systems.
drainage and surface water. Building Control will require invert levels to show there is
adequate fall, and details of any soakaways, treatment plant, or pumping systems.
Related categories:
Civil Engineering