Estimation of duration of earthwork with backhoe excavator by Monte Carlo Simulation

Job ID: 37455781

Budget: $250 – $750 USD

I need complete revalidation and verification of the attached civil engineering paper.
Estimation of duration of earthwork with backhoe excavator by Monte Carlo
Simulation.
Monte carlo code required for this work.