Bill of Quantity (BOQ) Extraction from Drawings
Budget: $30 – $250 USD
I have three PDF drawings that need to be analyzed and converted into a Bill of Quantity (BOQ) in an Excel format. The scope of the project includes:
Ideal candidates for this project should have a strong understanding of construction and engineering principles, experience in BOQ preparation, and proficiency in Excel. Attention to detail and the ability to accurately interpret engineering drawings are essential for success in this task.
BOQ should include the following:
construction
electric electronic works
mechanic
earth works
site works
railway
perimeter security
civil/mechanical/electrical infrastructure
The 3 PDF drawings to be downloaded are in the link below under ATT_13:
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912GB25R0011
ATT__13_Drawings_HN_COMBINED
ATT__13_Drawings_NSIP_COMBINED
ATT__13_Drawings_USAF_COMBINED
Ideal candidates for this project should have a strong understanding of construction and engineering principles, experience in BOQ preparation, and proficiency in Excel. Attention to detail and the ability to accurately interpret engineering drawings are essential for success in this task.
BOQ should include the following:
construction
electric electronic works
mechanic
earth works
site works
railway
perimeter security
civil/mechanical/electrical infrastructure
The 3 PDF drawings to be downloaded are in the link below under ATT_13:
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912GB25R0011
ATT__13_Drawings_HN_COMBINED
ATT__13_Drawings_NSIP_COMBINED
ATT__13_Drawings_USAF_COMBINED