Three-Section Residential Power Panel
Budget: ₹1,500 – ₹12,500 INR
I need a qualified electrician to design, assemble and install a residential distribution panel that is split into three completely independent single-phase sections for my house.
Each section must include:
• one BSES-supplied digital energy meter with an easy-to-read display
• one Schneider Electric ELCB
• one Schneider Electric MCB matched to that phase load
• two 16 A universal sockets
The three sections will be mounted in a single enclosure yet remain electrically isolated so I can monitor and service them separately. All wiring, bus-bar work, earthing, labeling and insulation should comply with current BIS and local DISCOM norms.
Deliverables I expect:
1. Schematic and enclosure layout for approval before fabrication.
2. Supply and installation of all Schneider Electric protective devices, branded sockets, enclosure and accessories.
3. Final commissioning report showing phase balance, insulation resistance and proper operation of every ELCB/MCB.
4. Sealing coordination with BSES once the meters are in place.
Please confirm your experience with residential panels of this type, the lead time you need for procurement, and any certifications you hold.
Each section must include:
• one BSES-supplied digital energy meter with an easy-to-read display
• one Schneider Electric ELCB
• one Schneider Electric MCB matched to that phase load
• two 16 A universal sockets
The three sections will be mounted in a single enclosure yet remain electrically isolated so I can monitor and service them separately. All wiring, bus-bar work, earthing, labeling and insulation should comply with current BIS and local DISCOM norms.
Deliverables I expect:
1. Schematic and enclosure layout for approval before fabrication.
2. Supply and installation of all Schneider Electric protective devices, branded sockets, enclosure and accessories.
3. Final commissioning report showing phase balance, insulation resistance and proper operation of every ELCB/MCB.
4. Sealing coordination with BSES once the meters are in place.
Please confirm your experience with residential panels of this type, the lead time you need for procurement, and any certifications you hold.