Design proposal
Budget: ₹1,500 – ₹12,500 INR
The client is an international Oil & Gas company who operate an existing oil and gas lease. Their name is ECU Energy. The opportunity is for the production and sale of Liquefied Natural Gas LNG (methane) and CO2 . The Field Development Plan indicates the field can produce 150 million standard cubic feet/day of Raw Gas from subsea wells. The client has defined the battery limit as downstream of the pipeline’s emergency shutdown valve (ESDV). The plant location is in the Mediterranean region The design life is 15 years. The anticipated production profile is 7 years on plateau of 150 mmscf/d of raw-gas and then a linear decline to 50 mmscf/d by the end of year 15.