Solar System Lines and Details for CA Fresno County Permit
Budget: $30 – $250 USD
I am looking for a professional solar system designer to assist me with a residential solar design for permits in CA Fresno County. I already have a rough draft of the solar system design blueprint, but I need someone with expertise to finalize the lines and details for the permit application. The ideal candidate should have experience in residential solar design and be able to work within a week to meet the project deadline.
PV SYSTEM COMMENTS:
1. Prove detail of solar panel mounting.
RESPONSE:___________________________________________________________
2. Overcurrent protection at the main service panel to comply with [ 2022 CEC 705.12(B)(1)(2)(d)].
RESPONSE:___________________________________________________________
3. Provide one line diagram for the proposed photovoltaic (PV) system.
RESPONSE:___________________________________________________________
Plan Check 23-0215 ABC 27743 Sky Harbour Dr.
4. Provide manufacturer’s specification sheets for all proposed solar panels, inverters, equipment, ect. for the photovoltaic (PV) system.
RESPONSE:___________________________________________________________
5. Provide warning sign labels for the photovoltaic (PV) system.
RESPONSE:___________________________________________________________
6. Solar panel setback from hips to comply with the California Fire Marshal guideline PV Solar Installation Section 2.1.1
RESPONSE:___________________________________________________________
PV SYSTEM COMMENTS:
1. Prove detail of solar panel mounting.
RESPONSE:___________________________________________________________
2. Overcurrent protection at the main service panel to comply with [ 2022 CEC 705.12(B)(1)(2)(d)].
RESPONSE:___________________________________________________________
3. Provide one line diagram for the proposed photovoltaic (PV) system.
RESPONSE:___________________________________________________________
Plan Check 23-0215 ABC 27743 Sky Harbour Dr.
4. Provide manufacturer’s specification sheets for all proposed solar panels, inverters, equipment, ect. for the photovoltaic (PV) system.
RESPONSE:___________________________________________________________
5. Provide warning sign labels for the photovoltaic (PV) system.
RESPONSE:___________________________________________________________
6. Solar panel setback from hips to comply with the California Fire Marshal guideline PV Solar Installation Section 2.1.1
RESPONSE:___________________________________________________________