LINOG programing for production plan.

Job ID: 31609097

Budget: $30 – $250 USD

i want some one help me to generate a code by LINOG programing for production plan.
the same details in the paper.

Summry:

●Title : Optimization Model for Multi-period Multi-Product Multi-objective Production planning.

●Requirements:9equations : total cost, total profit and Overall Service Levels quality.
Total cost = fixed costs + material costs + manufacturing costs + non-utilized capacity costs + shortage costs + transportation costs + inventory holding costs.

●The Constraints: Balance constraints,Capacity constraints,Linking (contracts)-Shipping constraints,Shipping-Linking constraints and Maximum number of activated locations constraints


●total it is 26 equation and constraints.