I am seeking an expert in Virtual Design and Construction (VDC) tools to create a comprehensive digital simulation of the Public Transport Operations Control Centre (PTOCC) construction site

This project aims to develop a realistic, sequenced, and visually engaging simulation of the construction environment using provided BIM resources. The simulation will help communicate site logistics, construction sequencing, and VDC methodology in support of a reflective report.

Scope of Work
The project involves:

Establishing a virtual site environment that includes key construction equipment and temporary facilities such as:

Cranes

Excavators and pumps

Scaffolding

Trucks and forklifts

Surveying tools (drones, laser scanners, total stations)

Temporary site offices and storage units

Site boundaries, fencing, and safety barriers

Developing a detailed site logistics plan using Revit or Twinmotion, including:

Access paths and staging zones

Equipment and material flow

Clear spatial coordination and justification

Modelling construction sequencing (4D) in Navisworks Manage:

Link model components to a basic schedule

Stage the build using logical, realistic construction phases

Show progression from site establishment through to final external works

Skills and Experience Required
Proficiency in Revit, Twinmotion, and Navisworks Manage

Experience in site logistics planning and construction staging

Ability to simulate workflows and communicate sequencing visually

Understanding of BIM model coordination and digital construction practices

Deliverables
You will provide:

A modified Navisworks model with all VDC components integrated

Supporting Revit and Twinmotion files (if used)

A combined PDF portfolio including:

Summary of your workflow

The rationale behind site layout, logistics, and sequencing

Screenshots showing:

Virtual environment and setup

Site logistics visualisation

Equipment Placement

Step-by-step construction sequencing

Optional: A short 4D simulation video or image storyboard (e.g. exported from Timeliner)

Build Phases to Follow
Structure the sequencing around these seven phases:

Site Preparation – fencing, surveying, setup of temporary facilities

Earthworks – site clearing, excavation, trenching

Foundations – concrete footings, slabs

Superstructure – structural frames, lift cores, stairs

Envelope – external cladding, windows, roofing

Services & Fit-Out – MEP installation, internal wall framing

External Works – landscaping, external lighting, signage, clean-up

Expectations
The simulation should be visually coherent, construction-accurate, and formatted to suit academic presentation.

All work must reflect best practices in construction planning and coordination.

A logical file structure and naming system must be used.

Stakeholder clarity and realism should be a core focus of the final visual outputs.