Civil Engineer Needed – Gunnison, Colorado (Utility + Drainage Plan Revisions for Permit Resubmittal) -- 2

Job ID: 40259417

Budget: $1,500 – $3,000 USD

Civil Engineer Needed – Gunnison, Colorado (Utility + Drainage Plan Revisions for Permit Resubmittal)

We are seeking an experienced Civil Engineer (Colorado) to revise an existing set of civil plans for a warehouse development project in Gunnison, CO.
You need to be in the USA and be able to stamp colorado Civil.
We have already completed a full set of plans and received City review comments. Most comments relate to stormwater, drainage, and utility coordination. Only address City Comments from 30 to 43

Your role is to review, correct, and prepare a permit-ready resubmittal package.

Project Scope: Only address City Comments from 30 to 43

Two metal warehouse buildings (site + utilities already designed)

Existing civil plans, drainage report, and utility plans provided

City review comments issued (see summary below)
You need to be in the USA and be able to stamp colorado Civil.
Key Tasks

You will be responsible for:

1. Stormwater / Drainage Fixes

Revise stormwater detention layout (conflicts with transformer + access)

Update grading to eliminate ponding in driveway

Add spot elevations, inverts, slopes, and pipe sizing

Coordinate catch basins and underground drainage system

Update drainage report to reflect:

Driveway runoff (not just roofs)

Storm infrastructure changes

Clarify 8” HDPE pipe system (source + discharge)

Ensure compliance with 100-year storm requirements

2. Utility Plan Corrections

Properly color-code utilities (water, sewer, etc.)

Resolve fire vs domestic water service configuration

Clearly show:
You need to be in the USA and be able to stamp colorado Civil.
Meter sizes and locations

Fire line vs domestic separation

Backflow preventers (type + location)

Resolve inconsistency:

(1) 1.5” meter vs (2) 1” meters

Label ownership limits per City requirements

3. Sewer + Water Coordination

Specify materials (SDR-35 PVC, etc.)

Detail connection to existing lined VCP sewer main

Provide correct connection method (Fernco saddle or approved equal)

Confirm bury depths and profiles

4. Site Coordination Issues

Resolve conflict:

Transformer located in drainage area

Trash enclosure located in drainage area

Ensure safe and code-compliant placement

Deliverables

Updated Civil Plan Set (permit-ready)

Updated Drainage Report-need to review and adapt new drainage report ( attached)

Marked-up response to City comments (optional but preferred)

CAD + PDF files

Requirements (DO NOT APPLY IF YOU DON’T HAVE THIS)

Experience with Colorado civil permitting (required)
You need to be in the USA and be able to stamp colorado Civil.
Strong background in:

Stormwater management - need to review and adapt new drainage report ( attached)

Utility design (water/sewer/fire)

Ability to produce permit-ready drawings

Familiarity with small-city review processes (Gunnison preferred)

Can stamp plans in Colorado OR coordinate with someone who can

Fast turnaround (we are on a tight timeline)

To Apply

Please include:

Relevant project experience (similar size/site work)

Whether you can stamp in Colorado

Estimated turnaround time

Your rate or fixed fee

Important

We are not starting from scratch — this is a targeted revision and resubmittal job.
We need someone who can quickly identify issues, fix them correctly, and get us approved.