analize Can Lis building by Jon Utzon for me

Job ID: 33836320

Budget: $30 – $250 USD

details needed in the analysis:
Concept of the design:
Response to physical context (topography, climate, vistas, urban pattern, historical urban pattern, etc.)
Response to social context (identity-culture-user requirements and needs):
Response to program: (use schematic drawings and photos):
Paths of movement (Approach to the building, entrance(s), horizontal and vertical circulation) Horizontal and vertical space organization (main zones in plans)
Indoor- outdoor relationship
Volumetric and spatial qualities of space (voids, level differences, physical and visual continuity) Response to structural system and material:
Related categories: Building Architecture Architecture