Lump-Sum Proposal for Revit Modeling and Architectural Specifications for Project in KSA
Budget: $5,000 – $10,000 USD
Lump-Sum Proposal for Revit Modeling and Architectural Specifications for Project in KSA
Dear [Name],
I hope this message finds you well.
The project consists of 3 basements, a ground floor, a first floor at podium level, and typical floors of two towers, one with 26 floors and the other with 21 floors. The total built-up area above zero level is 88,500 m².
We will provide accurate AutoCAD drawings for all plans, elevations, and sections. We seek an experienced freelancer or firm for lump-sum fees for the following phases:
Schematic Design Stage (LOD 200): [Insert Fee]
50% Construction Documents Stage (LOD 300): [Insert Fee]
100% Issued for Construction Stage (LOD 300) & Architectural Specifications: [Insert Fee]
Technical Specifications and Tendering Package Stage (LOD 300): [Insert Fee]
Please provide your lump-sum proposal for each phase, along with relevant work samples. Kindly submit your fees within the next 5 hours.
Best regards,
Dr. Emad Hamdy
This version includes the total built-up area above zero level within the job post.
Dear [Name],
I hope this message finds you well.
The project consists of 3 basements, a ground floor, a first floor at podium level, and typical floors of two towers, one with 26 floors and the other with 21 floors. The total built-up area above zero level is 88,500 m².
We will provide accurate AutoCAD drawings for all plans, elevations, and sections. We seek an experienced freelancer or firm for lump-sum fees for the following phases:
Schematic Design Stage (LOD 200): [Insert Fee]
50% Construction Documents Stage (LOD 300): [Insert Fee]
100% Issued for Construction Stage (LOD 300) & Architectural Specifications: [Insert Fee]
Technical Specifications and Tendering Package Stage (LOD 300): [Insert Fee]
Please provide your lump-sum proposal for each phase, along with relevant work samples. Kindly submit your fees within the next 5 hours.
Best regards,
Dr. Emad Hamdy
This version includes the total built-up area above zero level within the job post.