Establishing Emergency Exit Floor Plans (Industrial Building with basement, groundfloor and 1st floor)
Budget: $30 – $250 USD
For the ISO re-certification of our company, we need to establish three (3) different emergency floor plans.
We will provide all dimensions of rooms etc
The industrial building has:
Basement: 7 rooms
Ground floor: 7 rooms
1st Floor: 8 room
Plans do not need to be super sophisticated but should show employees and visitors the way to exit
A4 format or potentially A3 format
We'd like to obtain the data after the job in oder to make potential changes ourselves
We will provide all dimensions of rooms etc
The industrial building has:
Basement: 7 rooms
Ground floor: 7 rooms
1st Floor: 8 room
Plans do not need to be super sophisticated but should show employees and visitors the way to exit
A4 format or potentially A3 format
We'd like to obtain the data after the job in oder to make potential changes ourselves