Elpida/taslis poultry facility

Job ID: 32388969

Budget: €250 – €750 EUR

The poultry facility consists of one large steel-framed structure which is 219m long and 116m wide at the widest part, with a maximum height to the underside of the eaves of 10m. “The building required the flexibility of a clear span with minimal internal columns.