Construction Take off materials(BOM) (quantities) for residential building
Budget: $30 – $250 USD
Structural Take off materials (quantities) is needed for building construction including reinforcement bars per component(lengths, number for bars & total weight), concrete, internal& external wall Bricks, plaster,,,etc
* Bar Bending Schedule (BBS) for all steel works (+marked drawings) easy to follow for installation.
* Concrete for all
* Backfilling
* External double wall blocks and mortar mix quantities
* 15depthx20hightx40 width cm blocks (outer)
* 5cm width insulation between walls
* 10x20x40cm blocks (inner)
* Internal walls
* 20x20x40cm blocks
* Openings quantities
* Doors
* Windows
* Plaster
* Inside
* Outside
* Cellings areas
Note:
* Deliverables in excel sheet.
* All metrics units.
General description of the villa in term of area is attached. Architectural and structural complete drawings can be shared later.
* Bar Bending Schedule (BBS) for all steel works (+marked drawings) easy to follow for installation.
* Concrete for all
* Backfilling
* External double wall blocks and mortar mix quantities
* 15depthx20hightx40 width cm blocks (outer)
* 5cm width insulation between walls
* 10x20x40cm blocks (inner)
* Internal walls
* 20x20x40cm blocks
* Openings quantities
* Doors
* Windows
* Plaster
* Inside
* Outside
* Cellings areas
Note:
* Deliverables in excel sheet.
* All metrics units.
General description of the villa in term of area is attached. Architectural and structural complete drawings can be shared later.