Building Analysis (Using Revit)
Budget: $30 – $250 NZD
Task 1: 1000 words (excluding graph & pictures & references)
Critically evaluate the sustainability of the project "Earthship Ironbank"
Task 2: 3000 words (excluding graph & pictures & references)
Prepare a very basic residential building model and critically evaluate the sustainability of the model (building analysis) and the ways to improve the sustainability
Needs to be completed by 28 July 2021 (GMP 10am)
Critically evaluate the sustainability of the project "Earthship Ironbank"
Task 2: 3000 words (excluding graph & pictures & references)
Prepare a very basic residential building model and critically evaluate the sustainability of the model (building analysis) and the ways to improve the sustainability
Needs to be completed by 28 July 2021 (GMP 10am)