Lot consolidation documents Coleman for Ram
Budget: $30 – $250 USD
$210. (Ignore mandatory freelancer range)
Project for Ramchandra
- keep existing north south lot dividing lines and directionals move to separate layer and hide
- remove east west lot lines/show them being consolidated to create larger lots
- bring together all dwg Fileș into one or two dwgs
- extend shading
- extend Coleman Drive to reflect Civil drawings (Coleman is to be widened)
- owner name change
other related
Project for Ramchandra
- keep existing north south lot dividing lines and directionals move to separate layer and hide
- remove east west lot lines/show them being consolidated to create larger lots
- bring together all dwg Fileș into one or two dwgs
- extend shading
- extend Coleman Drive to reflect Civil drawings (Coleman is to be widened)
- owner name change
other related