solar engineer -- 2
Budget: $250 – $750 USD
Eng plans for PGE solar application submittal and one-line electrical plan for PGE interconnection for two (2) separate projects.
1) Ranch 70KW with 176 – 400-watt panels
2) River House 34KW with 85 - 400-watt panels
Del Smith
San Joaquin Country
209-743-1194
1) Ranch 70KW with 176 – 400-watt panels
2) River House 34KW with 85 - 400-watt panels
Del Smith
San Joaquin Country
209-743-1194