Wimbledon Depot Electrical Schematic and Calculations
Budget: £20 – £250 GBP
contractor required to provide cad drawings (engineering bias). 24 hour turnaround required
I have a project which need the Electrical Schematic updating, the updates are detailed on the other schematics attached.
I have attached the all of the design schematics and we need 169955-NRD-BML-WIM-DRG-EPT-400101 updating. I also have all of the attached documents in AutoCAD format. This will be issued to the contractor once the project has been awarded.
We also require a breakdown of the calculations for the final submission.
If any clarification is needed please drop me a massage.
Regards,
Barry
I have a project which need the Electrical Schematic updating, the updates are detailed on the other schematics attached.
I have attached the all of the design schematics and we need 169955-NRD-BML-WIM-DRG-EPT-400101 updating. I also have all of the attached documents in AutoCAD format. This will be issued to the contractor once the project has been awarded.
We also require a breakdown of the calculations for the final submission.
If any clarification is needed please drop me a massage.
Regards,
Barry