Urgent Tekla Structure Modification

Job ID: 38779958

Budget: $30 – $250 CAD

I NEED This Quick.

If you cannot start immediately and deliver i two days please DO NOT BID.

You MUST have Tekla full version.

Someone did an FEA model in ETABS (Will be provided) AND Robot Structure.

He also did the connection drawing in Tekla model.

However He did the tekla model in Student version (Will be provided) and The "TEKLA Structur Educational" across the drawings is unprofessional and cannot be submitted.

Additionally, the details are too small and unreadable, and the overall quality of the workmanship appears rushed and substandard.
I cannot use the provided drawings in their current state, and I need professional-looking documents with a proper logo and readable details.



Deliverables:
• Native file of TEKLA model
Material Specifications and Connection Details
• Material specifications:
o Grade of steel (e.g., ASTM A36, A992)
o Section properties (e.g., W-sections, S-sections)
o Surface finish (e.g., hot-rolled, painted)
• Connection details:
o Type of connections (e.g., bolted, welded)
o Bolt or weld sizes
o Connection configurations (e.g., lap joints, butt joints)
o Shop drawings or fabrication details for connections

Shop Drawings
• Member details:
o Detailed drawings of individual structural members (e.g., columns, beams, braces)
o Dimensions, section properties, and material specifications
• Connection details:
o Detailed drawings of all connections
o Bolt or weld sizes, hole locations, and tolerances
• Fabrication and erection details:
o Instructions for fabrication and erection of the steel structure
o Markings and identification numbers for members


Additional Notes:
• The analysis will comply with Canadian (CSA S16) structural codes and standards.
• The Client will provide the necessary architectural drawings and building details upon contract finalization.
• The location of the building is St. John’s Newfoundland Canada
• Time is of the Essence: The timely performance of this Agreement is essential. If the Contractor fails to complete the project within the agreed-upon timeframe, the Client may terminate this Agreement without liability. In the event of termination, the Contractor shall not be entitled to any progress payments for work completed prior to termination.
Related categories: Engineering CAD/CAM AutoCAD Tekla Structures