UK Territory Renewable Energy Site Drawing Review (ICE Stamp)
Budget: $250 – $750 USD
I have a full set of structural drawings for a new-build renewable energy site on a UK island territory and I need them reviewed and officially stamped by an Institution of Civil Engineers (ICE)-chartered structural engineer.
Scope of the review
• Structural drawings only – they cover support structures for solar panels, turbine foundations, and a small substation building.
• The design is for brand-new construction; no retrofit work is involved.
• All documentation is already prepared in PDF and DWG formats and follows current US / ASCE standards; I need a professional check for compliance and constructability plus your formal ICE stamp.
What I need from you:
1. A detailed mark-up or commentary on any required adjustments.
2. A concise calculation or verification note to support the stamped drawings.
3. The final sealed PDF set ready for submission to local authorities.
If you are ICE-chartered and have experience with renewable installations, especially hybrid solar-wind projects, I look forward to working with you.
Scope of the review
• Structural drawings only – they cover support structures for solar panels, turbine foundations, and a small substation building.
• The design is for brand-new construction; no retrofit work is involved.
• All documentation is already prepared in PDF and DWG formats and follows current US / ASCE standards; I need a professional check for compliance and constructability plus your formal ICE stamp.
What I need from you:
1. A detailed mark-up or commentary on any required adjustments.
2. A concise calculation or verification note to support the stamped drawings.
3. The final sealed PDF set ready for submission to local authorities.
If you are ICE-chartered and have experience with renewable installations, especially hybrid solar-wind projects, I look forward to working with you.