Technical Drawings for Retail Store in a Mall.
Budget: ₹1,500 – ₹12,500 INR
Require the following -
Layout including elevations and MEP
RCP coordinated layout with details of HVAC, fire and electrical.(in PDF and CAD).
- Front & other elevations (PDF).
- Heat load and electrical load calculation.
- Single line diagram( format attached ).
- TATA test report by the electrical contractor with stamp and signature (format attached).
- Sprinkler piping drawings with the diameter.
- The door of the stock room needs to be a FRD one.
- Artwork for the board out needs to be approved by the Mall.
Layout including elevations and MEP
RCP coordinated layout with details of HVAC, fire and electrical.(in PDF and CAD).
- Front & other elevations (PDF).
- Heat load and electrical load calculation.
- Single line diagram( format attached ).
- TATA test report by the electrical contractor with stamp and signature (format attached).
- Sprinkler piping drawings with the diameter.
- The door of the stock room needs to be a FRD one.
- Artwork for the board out needs to be approved by the Mall.