Sub Division Project
Budget: $30 – $250 NZD
Need to Sub divide the land (1.5 Hectar)
Need to Create a Road on Land and separate the lots ( Total 14 Lots )
Specification will be provided
Results:
Long Section of Roads and 3 water Pipes
Cut and fill ( Earth Volume Calculation )
Need to Create a Road on Land and separate the lots ( Total 14 Lots )
Specification will be provided
Results:
Long Section of Roads and 3 water Pipes
Cut and fill ( Earth Volume Calculation )