Sub Division Project

Job ID: 31241965

Budget: $30 – $250 NZD

Need to Sub divide the land (1.5 Hectar)
Need to Create a Road on Land and separate the lots ( Total 14 Lots )
Specification will be provided

Results:
Long Section of Roads and 3 water Pipes
Cut and fill ( Earth Volume Calculation )
Related categories: 3D Rendering AutoCAD 3ds Max 3D Modelling