Structural Design for Drinking Water Treatment Plant Structures (intake, flash mixers, clarifier, underground tank, etc.) takes a maximum of 3 days. 500 USD
Budget: $250 – $750 USD
More details:
What specific structural standards or codes should be followed for the design? British Standards (BS)
Which of the following structures need to be included in the design? Intake structure, Flash mixers, Clarifier, Filter, Ground tank, Pump station room
How soon do you need your project completed? 3 days
What specific structural standards or codes should be followed for the design? British Standards (BS)
Which of the following structures need to be included in the design? Intake structure, Flash mixers, Clarifier, Filter, Ground tank, Pump station room
How soon do you need your project completed? 3 days