Steel Detailing and analysis project 22
Budget: $250 – $750 CAD
we have a roof top equipment support structure 13m X 6.5m to be modelled and detailed. Connections to be detailed analyzed and report generated. GA, Single Parts , Anchor , BOM and Model source files to be supplied. ACAD files to qualified engineers only.