Site Office Building - MEP Design

Job ID: 34807365

Budget: $250 – $750 USD

Site Office – Shop Drawings

A. Civil/Structural Works for below: • A/G Potable Water Tank Foundation design/detailing with BBS • Pump Skid Slab for Water Booster Pump Set design/detailing with BBS

B. Mechanical Works including below: • Potable Water Layout including potable water pump and calculation • Sewer Network Layout and calculation • Split Type Wall Mounted HVAC layout and calculation

C. Electrical Works Including below: • Complete Electrical Works distribution network including but not limited to: Distribution Boxes, Power Cables, Grounding Cables, Tie-in to Transformer Room and office building electrical works including calculations