Redesign my structural slab
Budget: $250 – $750 USD
My supervisor notice that there is a fatal mistake it might do a deflection on the slab therefore he advise me to redesign my structural but only for slab .
There is very important notes to be considered :
1- i did start the building and reach up to columns stage ( no way go back and change the columns Desgin or the foundation)
2- all my pipes for plumbing and electrical is on the ceiling .
3- most of the AC on ground floor and also the master room in the first floor are duct split .
There is very important notes to be considered :
1- i did start the building and reach up to columns stage ( no way go back and change the columns Desgin or the foundation)
2- all my pipes for plumbing and electrical is on the ceiling .
3- most of the AC on ground floor and also the master room in the first floor are duct split .