Project Title: 9,000 SQFT Mixed-Use Pole Barn
Project Description
I am seeking a qualified engineer to provide structural and mechanical plans for a 150' x 60' (9,000 sq. ft.) post-frame building on a concrete slab. This is a multi-functional building featuring warehouse storage, professional office space, and individual flex-warehouse rental units.
Architectural Layout & Scope
The building is divided into two primary zones:
1. Two-Story Warehouse & Office Wing (60' x 70' Section)
First Floor: Open warehouse storage with one bathroom.
Heating: Ceiling-mounted gas unit heater.
Second Floor (Loft): 30' x 30' interior second story for professional offices and one bathroom.
HVAC: Requires a full, dedicated HVAC system (Heating/Cooling).
2. Flex-Storage Rental Units (80' x 60' Section)
Divided into four (4) 20' x 60' individual units.
Each unit must include:
A private bathroom.
A dedicated ceiling-mounted gas unit heater.
Required Engineering Deliverables
Structural: Full framing plans, post-embedment depths, and truss specifications for a 150' span.
Loft Engineering: Structural design for the 30' x 30' office floor (including live load calculations).
Mechanical (HVAC): Design for the office HVAC system and placement/venting for a total of five (5) gas ceiling heaters.
Plumbing: Rough-in and drainage layout for a total of six (6) bathrooms across the facility.
Permit Package: Stamped Architectural plan, Structural Plan & MEP Plan compliant with Hamilton County, Ohio building codes.
Timeline: 2-3 weeks
Project Description
I am seeking a qualified engineer to provide structural and mechanical plans for a 150' x 60' (9,000 sq. ft.) post-frame building on a concrete slab. This is a multi-functional building featuring warehouse storage, professional office space, and individual flex-warehouse rental units.
Architectural Layout & Scope
The building is divided into two primary zones:
1. Two-Story Warehouse & Office Wing (60' x 70' Section)
First Floor: Open warehouse storage with one bathroom.
Heating: Ceiling-mounted gas unit heater.
Second Floor (Loft): 30' x 30' interior second story for professional offices and one bathroom.
HVAC: Requires a full, dedicated HVAC system (Heating/Cooling).
2. Flex-Storage Rental Units (80' x 60' Section)
Divided into four (4) 20' x 60' individual units.
Each unit must include:
A private bathroom.
A dedicated ceiling-mounted gas unit heater.
Required Engineering Deliverables
Structural: Full framing plans, post-embedment depths, and truss specifications for a 150' span.
Loft Engineering: Structural design for the 30' x 30' office floor (including live load calculations).
Mechanical (HVAC): Design for the office HVAC system and placement/venting for a total of five (5) gas ceiling heaters.
Plumbing: Rough-in and drainage layout for a total of six (6) bathrooms across the facility.
Permit Package: Stamped Architectural plan, Structural Plan & MEP Plan compliant with Hamilton County, Ohio building codes.