Mechanical & Plumbing Plans for New Coffee Shop as an addition to existing adjacent restaurant
Budget: $750 – $1,500 USD
I'm in need of a Mechanical/Plumbing PE to assist with the submittal requirements for a new 2,000 square feet coffee shop being added to an existing adjacent 1,000 square feet restaurant. The City Plan Reviewer has requested detailed Mechanical and Plumbing plans.
Mechanical Requirements:
- Comprehensive HVAC drawings inclusive of ventilation requirements as per chapter 4 of the 2021 Mechanical code.
- Duct layout for heating and cooling, including load calculations and make-up air requirements for cooking equipment.
- Ventilation plans for toilet rooms.
Plumbing Requirements:
- Complete underground and water distribution drawings including pipe sizing.
There are no existing HVAC and ventilation plans for the current 1,000 square feet restaurant. Thus, I also need assistance in creating new plans for the existing space as well as the new coffee shop. The ideal candidate will have extensive experience in Mechanical and Plumbing engineering, with a professional license (PE) and a strong understanding of the 2021 Mechanical code.
Mechanical Requirements:
- Comprehensive HVAC drawings inclusive of ventilation requirements as per chapter 4 of the 2021 Mechanical code.
- Duct layout for heating and cooling, including load calculations and make-up air requirements for cooking equipment.
- Ventilation plans for toilet rooms.
Plumbing Requirements:
- Complete underground and water distribution drawings including pipe sizing.
There are no existing HVAC and ventilation plans for the current 1,000 square feet restaurant. Thus, I also need assistance in creating new plans for the existing space as well as the new coffee shop. The ideal candidate will have extensive experience in Mechanical and Plumbing engineering, with a professional license (PE) and a strong understanding of the 2021 Mechanical code.