I have an operating manifold facility and now need to tap into its header for a new wet-pipe fire-water system. I already hold complete, up-to-date P&IDs, GA drawings, and utility layouts, so the focus is purely on engineering the connection itself rather than re-surveying or onsite supervision.
Here is what I expect from you:
• A fully engineered design for the new fire-water take-off, including line sizing, valve arrangement, tie-in locations, and back-flow isolation that works seamlessly with the existing manifold.
• Hydraulic calculations demonstrating that the required flow and pressure for a wet pipe system will be achieved under all demand scenarios.
• Updated P&IDs and isometrics reflecting the new branch, issued for construction in native CAD (DWG) and PDF.
• A concise material specification and valve/data sheet package aligned with NFPA 13 and relevant local codes.
• A short constructability note set (tie-in method, shutdown time, hot-tap or cold-cut recommendation) so the installation crew can plan the outage.
Acceptance criteria: designs must meet NFPA 13, show minimum 20 % safety margin on hydraulic demand, and be ready for authority approval without additional rework.
If all looks good, I may later open a separate task for installation supervision, but for now I solely need the design package delivered. Let me know your estimated timeline and any data you still require from our end so we can kick off right away.
Here is what I expect from you:
• A fully engineered design for the new fire-water take-off, including line sizing, valve arrangement, tie-in locations, and back-flow isolation that works seamlessly with the existing manifold.
• Hydraulic calculations demonstrating that the required flow and pressure for a wet pipe system will be achieved under all demand scenarios.
• Updated P&IDs and isometrics reflecting the new branch, issued for construction in native CAD (DWG) and PDF.
• A concise material specification and valve/data sheet package aligned with NFPA 13 and relevant local codes.
• A short constructability note set (tie-in method, shutdown time, hot-tap or cold-cut recommendation) so the installation crew can plan the outage.
Acceptance criteria: designs must meet NFPA 13, show minimum 20 % safety margin on hydraulic demand, and be ready for authority approval without additional rework.
If all looks good, I may later open a separate task for installation supervision, but for now I solely need the design package delivered. Let me know your estimated timeline and any data you still require from our end so we can kick off right away.