Geodesic Dome Structural Design - All Steel members should be of same Length & Properties
Budget: $1,500 – $3,000 USD
1. As per Excel Sheet Table (excel sheet format)
Fill in Excel Sheet attached data with inputs from dome of various sizes
Excel sheet to be provided prior to the proceeding to determine that the project is feasible and viable.
2.
a. All models - 120 Models
if in case 2mm is not sufficient need to model with higher capacity such as 3 mm
b. Connector Options (3-4) & Details
Need to use the connector available in the market like China to save time for fabrication and send links to buy them. Design also needed if decided to fabricate locally
Glass facade to be installed so need to ensure that there is no water leakage and connection joints design is provided correctly
3. Detailed Drawings CAD (like Shop Drawings with all details)
4.
a. Calculations Sheet for All Models in format to be submitted to relevant governing bodies
b. Foundation Drawings (Raft Foundation)
Sample site layout is provided. Cad drawings can be shared also if required.
Fill in Excel Sheet attached data with inputs from dome of various sizes
Excel sheet to be provided prior to the proceeding to determine that the project is feasible and viable.
2.
a. All models - 120 Models
if in case 2mm is not sufficient need to model with higher capacity such as 3 mm
b. Connector Options (3-4) & Details
Need to use the connector available in the market like China to save time for fabrication and send links to buy them. Design also needed if decided to fabricate locally
Glass facade to be installed so need to ensure that there is no water leakage and connection joints design is provided correctly
3. Detailed Drawings CAD (like Shop Drawings with all details)
4.
a. Calculations Sheet for All Models in format to be submitted to relevant governing bodies
b. Foundation Drawings (Raft Foundation)
Sample site layout is provided. Cad drawings can be shared also if required.