Drainage & Domestic Water Design Review

Job ID: 40575690

Budget: £250 – £750 GBP

I have a commercial office scheme spread across nine storeys that is already 80–90 % engineered. What I need now is a sharp set of eyes on the public-health side to close everything out before close of play Wednesday 15 July.

Your brief centres on the BCWS schematic, which is lagging behind the latest layout and shows signs of an outdated arrangement. Alongside that, I want a final pass over the drainage and domestic hot- and cold-water pipework packages to be sure every drawing, calc and schedule aligns.

Key deliverables
• Updated BCWS schematic fully coordinated with current floor layouts
• Checked and re-presented hydraulic calculations (no formula changes, just accuracy and clarity)
• Equipment schedules brought to 100 % completion and cross-referenced to the drawings

Acceptance criteria
• No dimensional or flow discrepancies between schematic, layouts and schedules
• Calculations presented in a clear, editable format (Excel or similar) with traceable inputs
• All sheets issued as PDF and original authoring files (AutoCAD or Revit, plus native calc files) by 17:30 BST on 15 July

If you have UK commercial PH design experience and have taken projects through their final technical review before, that is exactly the background I’m after—please highlight comparable work when you respond.