Detailed Structural Drafting using REVIT
Budget: $750 – $1,500 AUD
Project Description:
- Multi townhouses on a shared basement.
- Basement carpark structure to be framed with reinforced concrete
- Townhouse structure made of timber
- Retaining wall will be constructed out of dincel (ready formed) concrete wall
- Concrete slab on grade
- Suspended concrete GF slab with multiple steps
Scope of work:
1- Stage 1 (Modeling): Model the concrete structure in the basement only. Timber housing structure does not need to be modelled as it is will be done in 2D CAD
2- Stage 2(Early works) Produce Basement wall General arrangement plan, elevations, sections and details
3- Stage 3 (Slab on Grade) Produce slab plan and typical detail (slab on grade does not require reinforcement plans as it is will be reinforced with mesh)
4- Stage 4 (GF Slab) including general arrangement plan, sections to cover stepping in the slab and different conditions, reinforcement plans, details
- Multi townhouses on a shared basement.
- Basement carpark structure to be framed with reinforced concrete
- Townhouse structure made of timber
- Retaining wall will be constructed out of dincel (ready formed) concrete wall
- Concrete slab on grade
- Suspended concrete GF slab with multiple steps
Scope of work:
1- Stage 1 (Modeling): Model the concrete structure in the basement only. Timber housing structure does not need to be modelled as it is will be done in 2D CAD
2- Stage 2(Early works) Produce Basement wall General arrangement plan, elevations, sections and details
3- Stage 3 (Slab on Grade) Produce slab plan and typical detail (slab on grade does not require reinforcement plans as it is will be reinforced with mesh)
4- Stage 4 (GF Slab) including general arrangement plan, sections to cover stepping in the slab and different conditions, reinforcement plans, details