Detailed Quantity Takeoff Specialist Needed
Budget: $250 – $750 USD
I Need works on the Quantity Takeoff:
To provide an accurate and complete quantity takeoff, please share the following:
Project Drawings / Plans
Architectural drawings (floor plans, elevations, sections)
Structural drawings (if structural elements are included)
MEP drawings (if takeoff includes mechanical, electrical, or plumbing)
In PDF or DWG format (PDF is okay for most jobs)
Specifications (if available)
Material specs, construction notes, or finish schedules
Helps clarify material types, dimensions, and quality
Scope of Work
A list of items you want included in the takeoff (e.g., “only concrete and steel,” or “everything for foundation”)
Project Location
Important for estimating labor, material prices, and waste factors (if you're also preparing a cost estimate)
Units Preferred
Do you want the takeoff in imperial (feet, yards) or metric (meters, mm)?
Deadline
When do you need the completed takeoff? Standard turnaround is usually 2–5 days depending on project size.
To provide an accurate and complete quantity takeoff, please share the following:
Project Drawings / Plans
Architectural drawings (floor plans, elevations, sections)
Structural drawings (if structural elements are included)
MEP drawings (if takeoff includes mechanical, electrical, or plumbing)
In PDF or DWG format (PDF is okay for most jobs)
Specifications (if available)
Material specs, construction notes, or finish schedules
Helps clarify material types, dimensions, and quality
Scope of Work
A list of items you want included in the takeoff (e.g., “only concrete and steel,” or “everything for foundation”)
Project Location
Important for estimating labor, material prices, and waste factors (if you're also preparing a cost estimate)
Units Preferred
Do you want the takeoff in imperial (feet, yards) or metric (meters, mm)?
Deadline
When do you need the completed takeoff? Standard turnaround is usually 2–5 days depending on project size.