DELINIATION FOR ELLI AND METAL CONTRACTOR AUTOCAD WORKS
Budget: $30 – $250 USD
this is the airport launch
the thing he like is detailing work
everything inside orange is need to draw
Green is wood metal (its steel need to drawn)
the metal in top on side has to been drawn as well
page 452 drawing 4 and 5 has to been drawn not detail for coordination purposes
702 has to been drawn
DO NOT DRAW IS METAL
MAKE EVERYTHING OPEN
NOT PUT EVERYTHING ON ONE PAGE
704 blue is metal in corner from metal contractors
yellow is wood panelling
746 is has to been drawn not detailed
747 blue spot is exicting you can copy or paste this if you want
750 no need any metal detailing
mdf panel and metal on top of it
760(Yellow is us doing something
blue is the panels
green is metal)
deadline is 2week
the thing he like is detailing work
everything inside orange is need to draw
Green is wood metal (its steel need to drawn)
the metal in top on side has to been drawn as well
page 452 drawing 4 and 5 has to been drawn not detail for coordination purposes
702 has to been drawn
DO NOT DRAW IS METAL
MAKE EVERYTHING OPEN
NOT PUT EVERYTHING ON ONE PAGE
704 blue is metal in corner from metal contractors
yellow is wood panelling
746 is has to been drawn not detailed
747 blue spot is exicting you can copy or paste this if you want
750 no need any metal detailing
mdf panel and metal on top of it
760(Yellow is us doing something
blue is the panels
green is metal)
deadline is 2week