Consolidate existing as-built backlog into a digital vault

Job ID: 34507190

Budget: $50 – $0 USD

Assemble, organize, catalog, and name files and as-built drawings from existing electronic
files in accordance with (IAW) ERDC/ITL TR-19-7, A/E/C Computer-Aided Design (CAD)
Standard, August 2019 and ERDC/ITL TR-19-6, A/E/C Graphics Standard, August 2019.
The files delivered to the contractor and back will be in both AutoCAD
and PDF formats. The existing backlog of as-built drawings from facility project contracts
are predominantly in AutoCAD format, so the Contractor will be responsible to correctly
identify and name the AutoCAD files, and then convert each one into PDF format if a PDF
format does not exist or needs corrections based on the changes made to the AutoCAD files.
An existing digital retrieval database (Microsoft Access format) will be populated with
prescribed attribute data for each drawing cataloged