Concrete pole footer design in Missouri

Job ID: 34709099

Budget: $30 – $250 USD

We are an electrical contractor and we have excavated and installed formwork and rebar for a parking lot pole fixture. We were informed by the municipality that they require stamped engineering drawings before they will inspect and approve us to pour concrete. I have made as-built drawings showing what we installed. We need a Missouri licensed structural engineer to either A) sign off on the as-builts, or B) redesign the drawing and we will make adjustments to the existing work to meet code. As built drawings are attached.

The pole is an existing 4" x 25' square steel pole, 11ga. As this is a pole that was previously installed at the same site, I do not have a spec sheet.

(2) fixtures will be direct arm mounted in a 180 degree orientation to each other at the top of the pole. The fixtures not be tilted from horizontal. Spec sheet with EPA data attached.