I'm looking for an experienced civil engineer or architect to develop a design for an underground waste pipe network for a farm.

This project will handle waste from various toilets, portable showers and kitchens.


The ultimate goal is to minimize system clogs and maintain efficient waste transportation.

Please tell me why I should give you my project to work on.
I will pay $20 for this drawing.

I need dawings with calcullations.


These are my project details:

Waste Network Plan
Point A is the reference point.
Point A is at ground level 0.0 cm
Point B is at ground level -46 cm
The waste pipe Between Point A and Point B is to be buried at a depth of 110 cm
Distance between Point A and Point B is 35 meters
The waste pipe from Point A to Point B should have a drop level of 1.5 cm per meter

Point C is at ground level -110 cm
The waste pipe Between Point B and Point C is to be buried at a depth of 110 cm
Distance between Point B and Point C is 32 meters
Point A and Point B are in direct line with Point C
The waste pipe from Point B to Point C should have a drop level of 1.5 cm per meter

The septic tank would be positioned next to Point C.


Point D is coming from the opposite direction to Point C (Point A to D are in Straight Line)
Point D is at ground level -110 cm
Distance between Point D and Point C is 19 meters
The waste pipe from Point D to Point C should have a drop level of 1.5 cm per meter
The waste pipe Between Point D and Point C is to be buried at a depth of 110 cm



Point E is coming from the right to Point C at 90 degrees
Point E is at ground level -126 cm
Distance between Point E and Point C is 53 meters
The waste pipe from Point E to Point C should have a drop level of 1.5 cm per meter
The waste pipe Between Point E and Point C is to be buried at a depth of 110 cm


Point F is at ground level -20 cm
Point F is coming from the right to Point B at 90 degrees
Distance between Point F and Point B is 47 meters
The waste pipe from Point F to Point B should have a drop level of 1.5 cm per meter
The waste pipe Between Point F and Point B is to be buried at a depth of 110 cm
Point F will connect directly to point B



Point C is the point where the septic tank will be placed


Calculate the dept at of waste pipe as arriving at Point C
Calculate the dept of waste pipe as arriving from Point A to Point B taking into consideration the required 1.5 cm drop per metre.
Calculate the dept of waste pipe as arriving from Point B to Point C taking into consideration the required 1.5 cm drop per metre.
Calculate the dept of waste pipe as arriving from Point F to Point B taking into consideration the required 1.5 cm drop per metre.
Calculate the dept of waste pipe as arriving from Point E to Point C taking into consideration the required 1.5 cm drop per metre.
All pipes coming from Point B, Point E and Point D arriving at Point C must be on the same level.