Civil Engineer | Architect | Quantity Surveyor

Job ID: 35255490

Budget: $10 – $30 USD

full villa estimate requirements
bill of quantities and TAKE-OFF SHEET for all and each item and link to bill of quantities
all cad drawing and excel sheet available
TAKE-OFF SHEET as pre the attached bill of quantities
Shell and Core Works: Excavation, Reinforced concrete works, block-work, plaster and waterproofing.
Finishing Works: Floor and wall tiles, Painting, Wooden Doors, Aluminium Windows, Metal works and False Ceiling Works.
MEP works: Electrical (Including Light Fittings), Water supply and Drainage works (Including Sanitary-ware) and Air Conditioning (HVAC).
Site Development Works: Boundary Wall, Interlock and kerb-stone works, Entrance gates etc.