Chile Mountain Tri Cabin

Job ID: 35039272

Budget: $250 – $750 USD

I am developing a commercial lot in Alaska. I have engineered drawings for the building, A plot plan, Public Water System plan. I am working on the grading plan at this time.
I will be installing a Siemens 600 amp (4x200 amp meters) which will be supplied by 2-350 single phase supply lines from the Utility company's transformer, I need help designing 2 of the legs, 1 is well pumps, infrared heaters, on site septic system, lights and EV Charging. The other is a 2000 ft2 building with 3 hotel suites and a cafe.

I have the entire site in Cadd