Campervan Electrical Prints Finalization
Budget: $25 – $50 USD
All core drawings for my campervan’s electrical package are roughed-in; now I need a qualified electrical engineer to turn them into a final, inspection-ready print set. The system covers the 12 V lithium battery bank, roof-mounted solar array, a 120 V inverter/charger circuit, plus the HVAC, galley appliances, and the complete low-voltage harness. Wiring diagrams, component specifications, and load calculations are already compiled, but they still need a professional pass for safety and code compliance.
Your task is to audit and refine the schematics, confirm conductor sizing, over-current protection, and grounding paths, and make sure every note and legend lines up with RV-specific sections of NEC, UL, and ABYC standards. Where anything is missing—fuse locations, isolation switches, conduit call-outs—I need you to add it or flag it clearly.
Deliverables
• A clean, layered drawing set (PDF + original CAD) ready for fabrication/inspection
• An updated bill of materials referenced to each drawing symbol
• A brief compliance memo outlining the standards checked and any assumptions made
I value concise, engineer-level annotations that make installation in the van straightforward for the build crew. Would require some on site work days in the Proto shop.
Your task is to audit and refine the schematics, confirm conductor sizing, over-current protection, and grounding paths, and make sure every note and legend lines up with RV-specific sections of NEC, UL, and ABYC standards. Where anything is missing—fuse locations, isolation switches, conduit call-outs—I need you to add it or flag it clearly.
Deliverables
• A clean, layered drawing set (PDF + original CAD) ready for fabrication/inspection
• An updated bill of materials referenced to each drawing symbol
• A brief compliance memo outlining the standards checked and any assumptions made
I value concise, engineer-level annotations that make installation in the van straightforward for the build crew. Would require some on site work days in the Proto shop.