Architect drawing of a energyhouse.
Budget: $30 – $250 USD
I need an architect's drawing of a simple building. The building must be similar to the images in the word document and be made technically according to the .pdf document (example 1 and example 2)
Drawing for Energyhouse:
The local builder High school is making a Energyhouse for me and need building instructions.
Floor plan
• The building's dimensions on the outside must be stated.
Section drawing
Cornice height should also be included in the section drawing. It is the height of the intersection between the outer surface of the outer wall and the roof surface.
• Ridge height is the height of the intersection between two sloping roof surfaces and must also be included in the section drawing.
• Roof angle. The municipality needs to see which roof angle is intended for the measure. The minimum roof angle varies depending on the type of measures to be carried out.
Facade drawings
• Viewed from all directions, north, south, east and west.
• These drawings show the architectural design
Maximum pay is 100 USD. If you dont want the job for this amount.... please dont apply.
Drawing for Energyhouse:
The local builder High school is making a Energyhouse for me and need building instructions.
Floor plan
• The building's dimensions on the outside must be stated.
Section drawing
Cornice height should also be included in the section drawing. It is the height of the intersection between the outer surface of the outer wall and the roof surface.
• Ridge height is the height of the intersection between two sloping roof surfaces and must also be included in the section drawing.
• Roof angle. The municipality needs to see which roof angle is intended for the measure. The minimum roof angle varies depending on the type of measures to be carried out.
Facade drawings
• Viewed from all directions, north, south, east and west.
• These drawings show the architectural design
Maximum pay is 100 USD. If you dont want the job for this amount.... please dont apply.