ASANA Project Data Entry Update
Budget: $10 – $30 USD
I have an existing ASANA project that now needs a thorough data-entry refresh. You will work from Excel sheets I supply and update everything directly inside the same ASANA workspace.
What you will actually touch in ASANA:
• Task titles
• Task due dates
• Task assignees
• Detailed task descriptions
• Creation of any required subtasks
• Completion of every additional task field/column we use (custom drop-downs, tags, priorities, etc.)
The spreadsheets map one-to-one with what belongs in each ASANA field, so the job is mainly accurate copy-and-paste work with light verification. I rely on you to keep naming conventions identical, respect existing dependencies, and double-check date formats before marking the project ready.
Deliverable: a fully updated ASANA project where every task, subtask, and field matches the provided Excel data and passes my spot check for accuracy.
If you are already familiar with ASANA’s bulk-edit, manual entry is fine as long as the end result is perfect.
ASANA’s CSV import tools is not allowed since the tasks already have a unique ID that you will require and matches the Excel source.
What you will actually touch in ASANA:
• Task titles
• Task due dates
• Task assignees
• Detailed task descriptions
• Creation of any required subtasks
• Completion of every additional task field/column we use (custom drop-downs, tags, priorities, etc.)
The spreadsheets map one-to-one with what belongs in each ASANA field, so the job is mainly accurate copy-and-paste work with light verification. I rely on you to keep naming conventions identical, respect existing dependencies, and double-check date formats before marking the project ready.
Deliverable: a fully updated ASANA project where every task, subtask, and field matches the provided Excel data and passes my spot check for accuracy.
If you are already familiar with ASANA’s bulk-edit, manual entry is fine as long as the end result is perfect.
ASANA’s CSV import tools is not allowed since the tasks already have a unique ID that you will require and matches the Excel source.