„Komplexe gewerkeübergreifende Steuerung eines Gebäudes mit KNX-BUS“

Job ID: 35083262

Budget: €250 – €750 EUR

The electrotechnical system
The building is supplied with electricity by the responsible distribution network operator (DSO), in this case e.dis AG, via a new 250 A house connection (HA). In addition, there is a planned PV system on the roof with an output of approx. 100 kWpeak. In addition to general consumers such as lighting systems, electric motor-driven window openers, blind motors, office equipment, kitchen equipment in the kitchenette, etc., several large consumers such as instantaneous water heaters, two heat pumps, a ventilation system as well as several charging stations for cars and e-bikes in the visitors' parking lot are to be supplied.
The KNX BUS is to be used as a uniform system for the switching and control of lighting, window openers, external blinds, blackout blinds and also the control valves for the underfloor heating across all trades. This BUS system will also be used to monitor the windows and doors by means of magnetic contacts.
Objectives of the bachelor thesis

Preparation of electrical installation and KNX BUS systems drawings with the help of AutoCad and DDS.
Application with the help of the ETS program Virtual implementation of exemplars for some rooms.
Lighting is switched by KNX pushbuttons in combination with presence detectors.
The south side of the building is equipped with controllable blinds.
Rod drives are window motors for opening and closing top-hung windows, louvre windows, sunshade louvers.
KNX weather stations with sensors for brightness, wind sensor,temperature sensor, humidity, rain sensor,air pressure. Time reception (sun position),
With KNX the heating reacts to disturbances and influence of the room temperature by different factors like open windows.
Within the scope of this bachelor thesis, the system concept for the KNX-BUS control for this building is to be created, coordinated and documented in a KNX scheme. This will be followed by the spatial allocation in an installation plan. Based on this, the BUS components are to be selected and described as items in a bill of quantities (BOS), including the expected costs.
Finally, a functional description is to be created