Relocate 5.5kW Split Aircon
Budget: $250 – $750 AUD
I’m planning to move my existing 5.5 kW split-system air conditioner to a different spot on the property and need a qualified technician who can handle the full process—carefully de-gas and remove the indoor and outdoor units, prepare the new site, run fresh wiring, and commission the system so it performs as it does now or better.
Because the new position has no dedicated supply, new wiring will be required from the switchboard to the outdoor unit, with all cabling neatly concealed and fully compliant with local electrical codes. Please include this electrical component in your quote and let me know which cable size and protection you intend to use.
I’m still deciding whether I’ll dispose of any leftover materials myself, so please note any additional charge if you take the old brackets, piping, or packaging away.
The ideal outcome is a clean, leak-free installation delivering the same cooling and heating capacity, with the work area left tidy and safe. If you’ve relocated units of this size before, especially when new wiring was involved, I’d love to hear how quickly you can schedule the job and how long you expect it to take.
Because the new position has no dedicated supply, new wiring will be required from the switchboard to the outdoor unit, with all cabling neatly concealed and fully compliant with local electrical codes. Please include this electrical component in your quote and let me know which cable size and protection you intend to use.
I’m still deciding whether I’ll dispose of any leftover materials myself, so please note any additional charge if you take the old brackets, piping, or packaging away.
The ideal outcome is a clean, leak-free installation delivering the same cooling and heating capacity, with the work area left tidy and safe. If you’ve relocated units of this size before, especially when new wiring was involved, I’d love to hear how quickly you can schedule the job and how long you expect it to take.