Dashcam Speed Violation Edit

Job ID: 40364263

Budget: $250 – $750 USD

I will hand you twenty consecutive one-minute dash-cam clips plus a Word document that marks every point where the car climbs above 75 mph. All of those clips need to live together in one master timeline so the full five-minute section of interest stays perfectly in sync; please import everything, duplicate the full track as a reference layer, and then work only on the speed and timeline data.

Your job is simple but precise:

• Any stretch where the speed exceeds 75 mph must be retimed so that the visual playback reflects a legal speed—nothing else should change. Segments already at or below 75 mph remain untouched.
• The GPS overlay and original timecode must stay readable and accurate after retiming.
• Once the edits are locked, slice the timeline back into the original one-minute files, keeping the same file names, and deliver both the rendered clips and the editable project file.

No extra text call-outs, graphics, or sound design are needed—just clean speed corrections and a timeline that matches the unedited footage frame-for-frame outside the modified segments.

Please note other demos have show editors have the capability to do what is needed, just need someone who either has the Team to do it or is doing it themselves, the hardest of the corrections on this is slowing down the video to make it seem normal and clear enhancing it so it looks like it really has slowed down to the speed limit. Not a complete document of the edits, I captured only the hardest ones.