Precast Concrete Design Rework
Budget: $30 – $250 USD
We are looking for an experienced architectural/CAD designer or a full team to revise and complete an entire drawing set based on the following:
Scope of Work:
Structural Update
Original drawings were based on pre-engineered steel structure.
Now changed to precast concrete system.
You must adjust the structure accordingly, including layout and dimensions.
Note: Elevations and total building height remain unchanged.
Architectural Rework
Interior layout needs to be developed (office, restrooms, etc.)
All relevant sections, elevations, and details to be updated.
Civil Coordination
Refer to the _civil_complied.dwg file. Civil drawings have been modified and must be reflected accordingly.
MEP Design Required (Guam Standard USA)
Full Mechanical, Electrical, and Plumbing drawings are needed based on the updated architectural layout.
Please confirm if you or your team can handle the full MEP scope.
Additional Notes:
We will provide an architectural concept and idea board for your reference.
Files include:
Original CAD (steel structure)
Precast layout reference
_civil_complied._file
Permit submission set (for background info)
Scope of Work:
Structural Update
Original drawings were based on pre-engineered steel structure.
Now changed to precast concrete system.
You must adjust the structure accordingly, including layout and dimensions.
Note: Elevations and total building height remain unchanged.
Architectural Rework
Interior layout needs to be developed (office, restrooms, etc.)
All relevant sections, elevations, and details to be updated.
Civil Coordination
Refer to the _civil_complied.dwg file. Civil drawings have been modified and must be reflected accordingly.
MEP Design Required (Guam Standard USA)
Full Mechanical, Electrical, and Plumbing drawings are needed based on the updated architectural layout.
Please confirm if you or your team can handle the full MEP scope.
Additional Notes:
We will provide an architectural concept and idea board for your reference.
Files include:
Original CAD (steel structure)
Precast layout reference
_civil_complied._file
Permit submission set (for background info)