Utility Water and Stormwater Mains and Pump Room 3-D Detailed Design
Budget: $20,000 – $50,000 USD
Two 8,000 foot long utility mains, one potable water and one stormwater drainage, are included in the scope for detailed fabrication-level 3-D design. We have a good set of contract design documents including drawings, specs, and a 3-D model to start with. We are looking for an experienced piping designer who can create these designs for our engineer of record, who will oversee the work. The final deliverables will be the 3-D model, 2-D traditional drawings of the main and associated three (3) drainage pump rooms.